Nigro Firm
KeenLook construction document
coordination review services
1-801-737-0814
info@nigrofirm.com
High Tiles
If the contractor installed the concrete slab floor according to the structural drawings they would be missing the depression for the tile floors shown in architectural. This would require demolition and re-pouring of a depressed slab or have a raised floor in certain rooms.
Note: AVW is an abbreviation for "At Variance With."

